UK Smart Metering Project.

SCM Logo Development and Implementation of a Major Smart Metering Project.

  • Highly complex and politically sensitive government initiated project.
  • Implemented WMS (SAP), carrier management (proprietary) and sophisticated (bespoke) triage systems.
  • Implementation of required quality and security standards including IS0 22301 (Business Continuity) / BS7858 (Staff Security) / HMG IS5 (data sanitisation) / ISO 9001 (Quality Systems) / ISO 14001 (Environmental).
  • Negotiation of complex contractual framework including Government flow down penalties.
  • Forward and Reverse Logistics set up including; inventory management (central and field engineer stock), kitting, testing and sophisticated triage solution.
  • Solution design from blue print to high level design (HLD) through to detailed low level design (LLD) and into implementation.
  • Selection and commercial negotiation with carriers and wast disposal partners including adoption of security protocols and flow-down liabilities.

Continue reading

WMS Implementation.

Coaching & Mentoring  Implemented ProAct WMS for a Retail Logistics Provider

  • Successfully implemented multi-user WMS implementation.
  • Created the definition of business needs to enable core modules to be adapted.
  • Full UAT including creation of test scripts for multiple client operations each with their own idiosyncrasies.
  • Managed test teams for the full test cycle Dev / Test / Fix / Test / Release.
  • Managed internal stakeholders and the supplier relationship.

Inbound Supply Chain Set-Up.

SCM Logo International Inbound Supply Solution for a Global Personal Care Manufacturer.

  • Designed and implemented a pan-European supply network for cosmetics produced at a new facility in the Far East.
  • Implemented a network of de-consolidation centres across Europe.
  • The incoterms were EXW to enable solid commercial management of all aspects of the service.

Freight Control Towers.

SCM Logo Set up Freight Control Towers for three major manufacturers.

  • Set up freight management, audit & expediting services from the same service centre.

  • Implemented customs and tax using deferment measures to improve cash flow.

  • Introduced inventory visibility & reporting.

  • Freight audit – reducing freight costs by 10-15%.

  • Bulk product audit – reduced billing errors by 7%

  • Container flow management – reduced demurrage and increased stock availability by c3 days.